Search
Close this search box.
Water well drilling Africa Uganda Drop In The Bucket Dokolo Township Primary and Nursery School

Dokolo Township Primary and Nursery School

Drilling at the Dokolo Primary School started on the 25th April, 2014. According to the drillers, they drilled through regular dirt for 7 meters and until they hit rock. From the 25th to the 30th April they drilled through rock until they had drilled

View Project

Atiira Secondary School

The drillers arrived in Atiira Secondary School on the 03rd May, 2014 and started drilling on the 04th May, 2014. We struck the first water at 15-16m and installed the permanent casing down to 20m, at this point the rock became too hard but unfortuna

View Project

Abule Primary School

The Abule Primary School in Uganda, district Soroti and sub-county Tubur, has 522 students with 251 boys and 271 girls.
The new well is 60 meters deep and yields 500 liters of water per hour. We first struck water at 8 meters, but needed to go much

View Project

Signup for our Newsletter